Architectural Applications

DETROIT - ENTERTAINMENT AND EVENT CENTER (USA-2016)


VECTOR-FOILTEC (ENGLAND)

PROJECT DESCRIPTION : Detroit Red Wings will be held around the arena multi-purpose roof steel construction PROJECT TYPE : Architectural STEEL WEIGHT OF THE PROJECT : 400  TONS YEAR OF ACTIVITY : 2016


ASTANA GLASS SPHERES OF SECONDARY STEEL PRODUCTION (KAZAKHSTAN - 2016)


LINDNER (GERMANY)

PROJECT DESCRIPTION : Manufacture of glass spheres made of steel for EXPO 2017. PROJECT TYPE : Architectural STEEL WEIGHT OF THE PROJECT : 120  TONS YEAR OF ACTIVITY : 2016


PRIME MINISTRY SERVICE BUILDING TO FENCE (TURKEY - 2014)


RONESANS CONSTRUCTION (TURKEY)

PROJECT DESCRIPTION :New Prime Minister's office building facade perimeter fence of protocol / protocol door manufacturing and installation jobs PROJECT TYPE : Architectural Application STEEL WEIGHT OF PROJECT : 350 TONS YEAR OF ACTIVITY : 2014


INDOOR SWIMMING POOL STEEL ROOF (TURKMENISTAN - 2014)


POLIMEKS CONSTRUCTION (TURKEY)

PROJECT DESCRIPTION :Indoor swimming pool with a capacity of 5,000 spectators structural steel fabrication and erection of roof PROJECT TYPE : Architrectural Application STEEL WEIGHT OF PROJECT : 2.300  TONS YEAR OF ACTIVITY : 2014


MONORAIL STATIONS (TURKMENISTAN - 2014)


POLIMEKS CONSTRUCTION (TURKEY)

PROJECT DESCRIPTION :Located on the monorail line fabrication and installation of station buildings PROJECT TYPE : Steel Buildings STEEL WEIGHT OF PROJECT : 2.500  TONS YEAR OF ACTIVITY : 2014


CONVENTION CENTER (TURKMENISTAN - 2014)


POLIMEKS CONSTRUCTION (TURKEY)

PROJECT DESCRIPTION : Awazu - Turkmenbashi structural steel fabrication and erection of the convention center PROJECT TYPE : Architectural Application STEEL WEIGHT OF PROJECT : 2.000  TONS YEAR OF ACTIVITY : 2014


IZMIR-ADNAN MENDERES AIRPORT ARCHITECTURAL STEEL TOWER (TURKEY - 2013)


LINDNER (GERMANY)

PROJECT DESCRIPTION : Izmir Adnan Menderes Airport Domestic Terminal 4 pieces of steel architecture tower steel works. PROJECT TYPE : Architectural STEEL WEIGHT OF THE PROJECT : 450  TONS YEAR OF ACTIVITY : 2013


PEDESTRIAN BRIDGE, HİLTON HOTEL OHİO (USA-2012)


ROSCHMANN (GERMANY)

PROJECT DESCRIPTION :Pedestrian bridge (30m) steel sructure for Hilton Hotel Ohio, detail design and manufaturing PROJECT TYPE : Architectural Applications STEEL WEIGHT OF PROJECT : 45  TONS YEAR OF ACTIVITY : 2012  


ZORLU CENTER (TURKEY-2011)


AKTURK CONSTRUCTION (TURKEY)

PROJECT DESCRIPTION :Zorlu center steel roof structure of a shopping mall, residence project. PROJECT TYPE : Architectural Applications STEEL WEIGHT OF PROJECT : 5.500  TONS YEAR OF ACTIVITY : 2011


FERRIS WHEEL (TURKMENISTAN-2011)


POLIMEKS CONSTRUCTION (TURKEY)

PROJECT DESCRIPTION :Fabrication and erection of 70 m diameter ferris wheel in Turkmenistan PROJECT TYPE : Architectural Applications STEEL WEIGHT OF PROJECT : 1.750  TONS YEAR OF ACTIVITY : 2011


AL FATEH UNIVERSITY STEEL STRUCTURE WORKS (LIBYA-2011)


RONESANS CONSTRUCTION (TURKEY)

PROJECT DESCRIPTION :Detailed design, fabrication and site erection of structural steel works for AL FATEH University - LIBYA Project. PROJECT TYPE : Architectural Applications STEEL WEIGHT OF PROJECT : 1.400  TONS YEAR OF ACTIVITY : 2011


ANAYASA MONUMENT STEEL TOWER STRUCTURE (TURKMENISTAN-2010)


POLIMEKS CONSTRUCTION (TURKEY)

PROJECT DESCRIPTION :Design, fabrication and erection of architectural steel tower for  ANAYASA MONUMENT PROJECT TYPE : Architectural Applications STEEL WEIGHT OF PROJECT : 190  TONS YEAR OF ACTIVITY : 2010


ARÇABIL VILLA STEEL DOORS & BRIDGES (TURKMENISTAN-2010)


POLIMEKS CONSTRUCTION (TURKEY)

PROJECT DESCRIPTION :Design, fabrication and erection of 5 units of automated steel doors and 3 steel bridges for ARÇABIL VİLLA PROJECT TYPE : Architectural Appliacations STEEL WEIGHT OF PROJECT : 70  TONS YEAR OF ACTIVITY : 2010


TRAFFIC SIGNALS STEEL STRUCTURE (TURKMENISTAN-2010)


POLIMEKS CONSTRUCTION (TURKEY)

PROJECT DESCRIPTION :Manufacturing and site erection of 38 nos stainless steel trafic signal steel structure PROJECT TYPE : Architectural Applications STEEL WEIGHT OF PROJECT : 30  TONS YEAR OF ACTIVITY : 2010


ROTATING SPHERE MONUMENT & OGUZHAN MONUMENT (TURKMENISTAN-2010)


POLIMEKS CONSTRUCTION (TURKEY)

Design, fabrication and erection of steel structure for rotating spheres and supply and installation of its electromechanical system  in Turkmenbashi, Turkmenistan Mimari Uygulamalar 100 TONS 2010


THE ART INSTITUDE OF CHICAGO FLYING CARPET (USA - 2007)


PERMESTEELISA GMBH (GERMANY)

Fabrication and transportation of steel structures for Flying Carpet at the Art Institute of Chicago in USA. Architectural Applications 650 TONS 2007  


CONNECTICUT SCIENCE CENTER FACADE STEEL STRUCTURE (USA - 2007)


PERMESTEELISA GMBH (GERMANY)

Fabrication of facade steel structure of Connecticut Center for Science and Exploration Center in Connecticut, USA. Architectural Applications 100 TON 2007


ASTANA SHOPPING MALL SKYLIGHT AND MEZZANINE FLOOR (KAZAKHSTAN-2007)


BAYTUR INC. (TURKEY)

Fabrication and erection of steel structures for skylights and mezzanine floor of Astana Shopping Mall in Astana, Kazakhstan. Mimari Uygulamalar 300 TONS 2007


MARDAN PALACE (TURKEY-2007)


ZAFER CONSTRUCTION (TURKEY)

Fabrication and assembly of steel composite floors in Safisa Istanbul & Istanbul Hotel Project in Lara, Antalya. Architectural Applications 3.500 TONS 2007


AUDIENCE HALL ROOF CONSTRUCTION OF DRAM THEATHER TURKMENISTAN


SAHTURKMEN

Fabrication and supervision of audience hall steel roof structure of 500 seated dram theater building in Balkanabat, Turkmenistan.


CONCORDE HOTEL STEEL ROOF STRUCTURE


ZAFER CONSTRUCTION

Design fabrication & erection of Concorde shaped roof structure


FLOOR STAIRS


ECZACIBASI CONS.

-------


MANDARIN HOTEL - ROOF STRUCTURES OF THE ATRIUM AND THE CONFERENCE HALL


HEMA-OUE

Design, manufacturing and assembling of the steel roofs of Atrium and Conference Hall


FENERBAHCE ARMY HOUSE


OZERTAS CONSTRUCTION

Arched roof steel manufacturing and erection


YAPI KREDI BANK OPERATIONS CENTER


CUHADAROGLU

Steel structure works of the operation center complex gutters, stair towers, link bridges etc.


AMPHITHEATRE ROOF


EMLAK PAZARLAMA

Turnkey construction of the architectural and acoustical roof of the amphitheatre in BAHÇEŞEHİR


TATİLYA ATRIUM ROOF & STEEL WORKS


BAYINDIR HOLD ÇUHADAROĞLU

Turnkey project for fabrication and erection of semi-cylindrical atrium roof with 55 m span, 115 m length and 36.5 m height


SKYLIGHT CLEANING SYSTEM


BTM

Steel construction columns and girders of different sizes


MINISTRY OF FINANCE NEW BUILDING


ÇUHADAROĞLU

Design, manufacturing and erection of the entrance canopy and the facade supporting structure


  • WHY STEEL ?

    SAVES MONEY Thanks to its lightness, the basement procedures are much easier, saves your money because of easy construction and increases the space (250 msq in 30 storeys.) 

  • WHY STEEL ?

    IS ENVIRONMENTALLY FRIENDLY The production process does not produce any waste products.IS EASY TO ASSEMBLE Time is money. With the dry construction method, it saves half of your time.

  • WHY STEEL ?

    FLEXIBLE APPLICATION Provides 50 - 100 years of life to the building, and 10-15 years to the  installations.  The purpose of use may vary, easy to assemble easy to renew. 

  • WHY STEEL ?

    IS DURABLE Steel is resistent to earthquakes, fire and corrosion.