Wind Tower Fabrication
Capacity
| Total facility area | 90.000 m² | 
| Raw material storage area | 25.000 m² | 
| Production area | 30.000 m² | 
| Tower storage area | 35.000 m² | 
The present capacity is established for 60-80 towers/year with an allocation to increase the capacity to 120-160 towers.